Comments on buildings and the Surfside collapse, from a reader

 
The green building insanity had not started at the time Surfside was built (1980).
 
In the 1970s, some professors at Univ. of Illinois at Urbana-Champlain theorized about very well insulated and well air-tightened houses with energy-recovery ventilation to all rooms, and built six of them. The houses required a very small fraction of the energy of comparable houses. After much measuring and public tours, they sold the houses, which last time I saw them were still occupied. The houses were well publicized, including an article in Scientific American that called them “Lo-Cal Houses.” What happened as a result of all the publicity was…..nothing.
 
Some years later the Canadian government got on the bandwagon, and built “The Saskatchewan House,” also very well insulated, etc. but with $300,000 worth of solar panels, perhaps to “prove” that such things could not be done without government “help”. That was perhaps the start of the government push for green buildings.
 
Fast forward to now, and there is probably not one company in the US supporting itself by making existing buildings energy efficient. Some claim to, but a little asking inevitably reveals financial support from government programs. This translates to the loss of opportunity for all to live in healthier, more comfortable buildings for lower cost, and to avoid all the costs of wars that so often seem to take place in energy related locations.
 
New buildings that use 10 or 15% of the average energy of existing buildings can be built at zero extra cost  -  I know from having helped design over 100 of them. A You-Tube video describes some of our efforts: “803 Knickerbocker Avenue”. But, zero extra cost makes the people living off the free money look bad, thus is a shunned practice in the industry.
 
The latest insanity is to build new buildings that use zero fossil fuel – electricity only. As the electric grid in the US is 32% efficient at converting fossil fuel into electricity at the customer’s meter (according to the EPA), burning fossil fuel at the power plant instead of the building usually results in a large increase in fossil fuel burned. But, the image created is positive, and is quickly being required by law in more and more locations in the US. This practice used to be called “conversion to all-electric,” but the improved name “strategic electrification” was soon coined, and now that term is obsolete, replaced by “decarbonization of buildings.” Bill Gates recently wrote a book advocating saving the planet by switching most or all energy uses to electricity, and advocates green buildings. The green building example he includes a photo of has no insulation and arguably no walls – it is a glass box. The building is famous for using advanced and expensive technology to save water – in Seattle (where it rains more than most places).
 
The insanity of green buildings, often with zero insulation, will probably continue for the foreseeable future, with more and more “funding” (your money) behind it each year. But, I think that insanity had nothing to do with what happened in Florida.
 
Here is a link to the structural engineer’s 2018 report on Surfside (the structural engineer’s report follows a report about the heating/cooling systems).
 
The sense I get from reading the report is that the engineer is not alarmed at what he saw, which tells me that perhaps this level of damage is common along the coast there.
 
As for the part of our Chair’s question about government regulations causing the collapse, I cannot think of any specific regulation, only the overall regulatory environment. Construction of new buildings is heavily regulated, with the illusion created that things are therefore done right.
 
In New York City, I have seen engineers sign off on the quality of and testing of structural systems buried underneath the building a year before they were hired. In other words, they sign off on things they have never seen and couldn’t know anything about. I have seen test drilling reports that give details of the soil and rock 100 feet under a construction site, yet when we dig out the basement from the building that used to be there the concrete floor of the old basement is in pristine condition – none of the reported and certified drill holes penetrated the basement floor. In other words, the drilling went down maybe six or seven feet, and the report was simply fabricated. (Now we always send someone to watch that at least the drilling was done). When we hire a surveyor to take six or seven measurements, they send one or two measurements with an invoice. We protest and ask them to go back and take the rest of the measurements, and they produce them in an hour. I once tried to hire someone to test the quality of mortar (similar to concrete, but with lime added and no gravel). One testing company after another gave me the runaround. Finally a guy named Westerfield answered at one company. Turns out his grandparents lived a few houses from where I grew up, and I persuaded his company to charge me for a test. After paying for the test up front, Westerfield showed up and demanded to see the blueprints, making it clear he would do no testing without seeing the plans. He turned to the page showing that the mortar was supposed to be type “N”, and then asked to see documents showing the name of the contractor, or no test. After being told the name of the contractor, we proceeded to the construction site, where he got a milk carton from the garbage and filled it with some mortar. I asked about the 1” square brass molds that are supposed to be used to make the cubes which are strength tested after seven days, and others at twenty-eight days. He said he forgot the cubes, but would put the mortar from the milk carton into the cubes when he got back to the office. Thirty days later I got a report that had blank spaces for the strength tests, but said the mortar was type “N”.
 
South Florida is known in the construction industry for being more corrupt than other places, so I can only imagine how much was skimped on in the construction of Surfside.
 
As to what actually happened to the structure, picture a building with tall columns in front – like The Lincoln Memorial or some such. Picture your kids build a clubhouse halfway up the columns with some boards they find lying around. The boards are supported by the columns, and are actually helping support the columns. The Euler Column Formula says that the weight a column can support is inversely proportional to the square of the “unsupported,” or unbraced length (height) of the column, therefore whatever support the kids’ clubhouse provides helps the columns resist buckling. The Lincoln Memorial was obviously built with columns that can support the load, but the clubhouse could provide critical help if the columns deteriorated. If your kids didn’t find any wood lying around, and instead strung a hammock between the columns, the hammock would put a sideways load on the columns, greatly reducing the load the columns could support. Real world buildings generally depend on each floor helping brace the columns. The pool deck at Surfside, which was deteriorating, and which someone reported seeing collapse first, had the responsibility of helping support other parts of the structure. Perhaps it hung like a hammock for a very short period of time as it collapsed – helping destroy the rest of the nearby structure. Or, perhaps the rest of the structure simply couldn’t stand without the bracing it provided. And, if the garage below it was multi-story (I don’t know), the falling pool deck would likely cause the garage floor below it to collapse onto the next floor down, first putting a hammock-like load on that floor for a fraction of a second before that floor collapsed, leaving at least two stories of columns unsupported.
 
One “solution” that will be discussed is requiring the use of epoxy-coated steel reinforcing bars in concrete in locations near the ocean, and maybe elsewhere. Next time any non subway-riding list members are enjoying their freedom to drive anyplace at will and are stuck in traffic, look for the green rebar now frequently used in highway and bridge construction. The requirement for epoxy coated rebar is perhaps well meaning, but if/when the bars are bent for use in the concrete, the epoxy coating cracks, leaving small areas exposed. Then electrolysis causes most future corrosion (ocean front or not) to take place where the epoxy is missing, instead of being spread out over the length of the bar, leading to failure sooner than if the rebar was simply bare steel. Presumably after some decades this problem will be discovered, perhaps publicized by a few bridge or building collapses. Then, in an echo of Ayn Rand’s discussion of Reardon Metal, someone will discover that improved steel alloys, such as the stainless steel your breakfast spoon is made of, can solve the problem at a very reasonable cost.